Connect with us

News

Space X Crew Dragon Safely Splashes Down with Crew-1 Astronauts from International Space Station (ISS).

Avatar

Published

on

Four astronauts splashed down safely in the Gulf of Mexico Sunday, completing NASA’s first commercial crew, long-duration mission aboard the International Space Station (ISS). The return comes nearly six months after the crew members arrived at the microgravity laboratory and also marks the longest-duration mission of a crewed American spacecraft to date.

SpaceX’s Crew Dragon, carrying NASA astronauts Michael Hopkins, Victor Glover, and Shannon Walker, and Japan Aerospace Exploration Agency astronaut Soichi Noguchi, returned to Earth in a parachute-assisted splashdown at 2:56 a.m. EDT off the coast of Panama City, Florida. Crews aboard SpaceX recovery vessels successfully recovered the spacecraft and astronauts. After returning to shore, the astronauts will fly back to Houston.

“Welcome home Victor, Michael, Shannon, and Soichi, and congratulations to the teams at NASA and SpaceX who worked so hard to ensure their safe and successful splashdown,” said Sen. Bill Nelson, who was confirmed by the Senate to serve as NASA Administrator on April 29. “We’ve accomplished another incredible spaceflight for America and our commercial and international partners. Safe, reliable transportation to the International Space Station is exactly the vision that NASA had when the agency embarked on the commercial crew program.”

NASA’s SpaceX Crew-1 mission launched Nov. 15, 2020, on a Falcon 9 rocket from the agency’s Kennedy Space Center in Florida. The astronauts named the spacecraft Resilience, in honor of their families, colleagues, and fellow citizens and highlighting the dedication displayed by the teams involved with the mission and demonstrating that there is no limit to what humans can achieve when they work together. Crew Dragon Resilience docked to the Harmony module’s forward port of the space station Nov. 16, nearly 27 hours after liftoff.

Overall, Hopkins, Glover, Walker, and Noguchi traveled 71,242,199 statute miles during their 168 days in orbit (with 167 days aboard the space station), completing 2,688 orbits around Earth. With splashdown, the crew also broke the American crewed spacecraft mission duration record of 84 days, 1 hour, 15 minutes, set by the final Skylab crew in February 1974.

Crew-1 also is the first night splashdown of a U.S. crewed spacecraft since Apollo 8’s predawn return in the Pacific Ocean on Dec. 27, 1968, with NASA astronauts Frank Borman, Jim Lovell and Bill Anders.

Throughout their mission, the Crew-1 astronauts contributed to scientific investigations and technology demonstrations, in addition to spacewalks and public engagement events, while aboard the orbiting laboratory. From studying protein crystal development to advance new drug discoveries, to demonstrating robotic assistant technologies, their work advances exploration of the universe while bringing benefits back to Earth.

They also grew crops in both the Advanced Plant Habitat and Veggie plant growth facilities, and conducted tests of a new method for producing semiconductor crystals. The astronauts contributed hundreds of pictures of Earth as part of the Crew Earth Observation investigation, one of the longest-running investigations aboard the space station, which contributes to tracking of natural disasters and changes to our home planet. The crew also tested a new tape dispenser, designed and produced by students as part of the High Schools United with NASA to Create Hardware (HUNCH), during the mission.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published.

News

Fushidhiggaru project ongoing, will finish on time: Government

FI

Published

on

By

The Maldives government on Sunday assured Fushidhiggaru reclamation project, a key initiative under the vision of President Dr. Mohamed Muizzu, has not stalled and would be completed on the scheduled date.

President’s Office Chief Spokesperson Heena Waleed confirmed this on Sunday at a press conference, while providing details on other government initiatives.

The state has responded about the large-scale development project amid speculation in social media and by political opponents, claiming the initiative has stalled.

In response, Heena highlighted that the sand dredging in the project is currently on pause, stressing this was not indicative of the entire project being halted.

“I would like to ask, if they gauge the ongoing status of a capacity based on whether sand dredging is ongoing or not. Although sand dredging has stopped, there would be several other associated components of the project that requires attention and execution,” Heena commented.

She further said the project requires administrative and other work, all of which, she added, were ongoing.

“In response, I would like to reply that the Fushidhiggaru project has not stalled, it is ongoing. The project would conclude as per the scheduled date announced by the President,” she said.

Under the large-scale development project, 1,153 hectares of land will be reclaimed, which is thrice the combined size of Hulhumale’ Phase I and II.

The iniatiative commenced officially on December 18, 2023 while the Maldives President assured the reclamation component will conclude within eight months from the date of commencement.

Source(s): sun.mv

Continue Reading

News

Efforts underway to submit new laws to Parliament

FI

Published

on

By

Chief Spokesperson at the President’s Office Heena Waleed has stated that efforts are underway to complete the administrative preparations for introducing new laws and amendments to the Parliament, with the government achieving a super majority in the parliamentary elections.

Heena stated there are several crucial laws to be presented to Parliament under the government’s week-14 legislative agenda. As such, laws relating to housing, the criminal justice system, social security are to be submitted. On this stance, Heena affirmed that the laws and amendments which have been stalled in the committee phase will be given a top priority to be implemented by the end of President Dr. Mohamed Muizzu’s tenure.

Furthermore, Heena revealed that over 200 laws are to be implemented, aiming to fulfill President Dr. Muizzu’s commitment outlined in the government’s manifesto. She assured that the elected Parliament will play a significant role as their views align with that of the president.

Observing that the government attained a super majority during the parliamentary elcetions was due to the unwavering trust in President Dr. Muizzu, Heena affirmed that this advantage will not be exploited. She guaranteed that the super majority will assist the government in implementing and enforcing policies that will benefit the public as per the respective policies.

Source(s): PsmNews

Continue Reading

News

Islamic Minister discusses expanding Zakat House

FI

Published

on

By

Minister of Islamic Affairs Dr. Mohamed Shaheem Ali Saeed has met with the Director General of Zakat House Director Dr. Majid Sulaiman Al-Azimi to discuss upgrading the Maldives Zakat House.

The minister confirmed this via X (formerly Twitter), highligting that the two discussed about expanding the services of the Zakat House, including staff and Sharia Board training, and the legal requirements of Zakat recipients.

Earlier, the minister announced the administration’s plan to introduce a financial aid system to extend aid to orphans permanently. Dr. Shaheem said orphans will receive financial support annually until adulthood.

However, the minister did not specify how much the government intended to provide as financial support each year.

The current administration established the Maldives Zakat House with the objectives of increasing public awareness on the importance of paying Zakat, and foster love among the public towards the Islamic sacred act.

Under the Zakat Fund, government provided financial support to 52 individuals earlier in March 2024.

Statistics recently provided by the Zakat House showed the fund had been disbursed mainly in four areas, which are;

For Cancer Treatment – MVR 190,822.50
Brain Surgery – MVR 180,407.19
Heart Surgery – MVR 8,482.00
Transplants – MVR 25,443.00

Additionally, another MVR 227,872.50 was disbursed for various other areas.

Source(s): sun.mv

Continue Reading

Trending